I prepped the floor with two layers of R 12.5 rigid foam insulation. I'm not sure specifically what type as I just went to the building center and asked for insulation I could lay below a concrete slab. It has a picture of Pink Pather on it ;-)
I also put a layer of 6 mil plastic between the two layers of foam. Most designs seem to lay the plastic on top of the gravel, then one layer of foam. I figure that would perforate the plastic and I knew I would have two layers.
On top of the 2nd layer of foam I put 3 inches of sand, compacted it and it awaits the concrete slab.